Crossett 200MW Energy Storage Project / Crane County, TX
What does a battery storage facility utilizing lithium-ion phosphate batteries look like?
Mortenson was chosen to engineer, procure, and construct (EPC) the standalone 200MW/200MWh Crossett Power Management battery storage facility utilizing lithium-ion batteries housed in battery enclosures. The battery energy storage project provides fast-responding, firm dispatchable power to enhance reliability and time-shift renewable energy production to times of high consumer demand.
In addition, the team was also the EPC partner for a 138kV substation interconnecting the battery system to the power grid.
Facts And Figures
200 MW / 200 MWh Energy Storage
138kV Substation
Commercial Operation June 2022
Delivery Methods
EPC